TMA PBS Level 1 Vehicle Monitoring Scheme (NSW)

Telematics Monitoring Application (TMA)

NSW PBS Telematics Conditions

PBS vehicles at all performance levels (i.e. Level 1-4) that meet Tier 1 bridge formulae must be enrolled in;

  • RIM when operating at General Mass Limits (GML) or Concessional Mass Limits (CML), or
  • TMA (or alternatively IAP) when operating at Higher Mass Limits (HML).

PBS vehicles at all performance levels (i.e. Level 1-4) that do not meet Tier 1 bridge formulae must be enrolled in;

  • TMA (or alternatively IAP) when operating at GML, CML or HML.

V-DAQ RIM & TMA Pricing

Notices:

National Class 2 Performance Based Standards (Tier 1) Authorisation Notice 2022

The NSW PBS Telematics Conditions apply to this notice.

The National Class 2 Performance Based Standards (Tier 1) Authorisation Notice 2022 provides eligible Tier 1 Performance Based Standards (PBS) vehicles with immediate access to relevant PBS networks across Australia to operate on approved networks without the need of a permit as soon as a Vehicle Approval is issued, although this may be at a restricted mass.

NSW PBS Access Maps

National Class 2 Performance Based Standards Vehicle (Tier 1) Authorisation Notice 2022

National Class 2 Performance Based Standards (Tier 1) Authorisation Notice Operator’s Guide

Notes: PBS Level 2B access is limited to 68.5t in NSW under this notice.

National Class 2 Performance Based Standards (High Productivity) Authorisation Notice 2022

The NSW PBS Telematics Conditions apply to this notice.

The National Class 2 Performance Based Standards (High Productivity) Authorisation Notice 2022 (No.1) which currently only applies in New South Wales and Victoria, enables eligible Performance Based Standards (PBS) vehicles to operate on approved networks without a permit.

NSW PBS Access Maps

National Class 2 Performance Based Standards (High Productivity) Authorisation Notice 2022

National Class 2 Performance Based Standards (High Productivity) Authorisation Notice Operator’s Guide

Notes: PBS Level 2B vehicles which meet the reference designs can operate at up to 85.5t in VIC and up to 85.5t in NSW under this notice.

PBS A-Double Reference Designs:

PBS A-Double Reference Design 1
PBS A-Doubles Reference Design 2
PBS A-Double Reference Design 3

Which Map To Use?

National Class 2 PBS Level 1 & 2A Truck and Dog Trailer Authorisation Notice 2021

Class 2 PBS Level 1 & 2A Truck and Dogs can still operate under the National Class 2 PBS Level 1 & 2A Truck and Dog Trailer Authorisation Notice 2021.

NSW PBS Access Maps

National Class 2 PBS Level 1 & 2A Truck and Dog Trailer Authorisation Notice 2021

Talk to a Specialist

Would you like to talk to someone now? Please fill in your details and one of our specialists will contact you shortly.  

Thank you! We will be in touch shortly!

Oops! Something went wrong while submitting the form

Other schemes where a Telematics Condition is required

Telematics Monitoring Application (TMA)

TMA PBS Vehicle Monitoring Scheme (WA)

June 2023
WA

May be required to attain a PBS Permit

Road Infrastructure Management (RIM)

RIM PBS Level 2A Vehicle Monitoring Scheme (NSW)

2021
NSW

A road condition for PBS vehicles operating in NSW

Road Infrastructure Management (RIM)

RIM Semi-Trailer Farm Gate Access Scheme (NSW)

Commencement Date: 26th February 2021
NSW

Provides exemptions for eligible heavy vehicles to access council roads within approved areas without Permit.

Telematics Monitoring Application (TMA)

TMA Livestock Loading Scheme (NSW)

Commencement Date: 8th October 2020
NSW

B-triples and AB-triples can now operate under the Livestock Loading Scheme if they are enrolled in the Telematics Monitoring Application (TMA).

Road Infrastructure Management (RIM)

RIM Road Train Farm Gate Access Scheme (NSW)

Commencement Date: 26th February 2021
NSW

Provides exemptions for eligible heavy vehicles to access council roads within approved areas without Permit.

Road Infrastructure Management (RIM)

RIM B-Double Farm Gate Access Scheme (NSW)

Commencement Date: 26th February 2021
NSW

Provides exemptions for eligible heavy vehicles to access council roads within approved areas without Permit

Road Infrastructure Management (RIM)

RIM Safety, Productivity & Environment Construction Transport Scheme (SPECTS) (NSW)

Commencement Date: 1st July 2016
NSW

SPECTS allows participating heavy vehicles greater network access and the ability to carry more construction materials, in return for meeting higher environmental, safety and compliance standards.

Road Infrastructure Management (RIM)

RIM Port Botany Container Movement Efficiency Scheme (NSW)

Commencement Date: 11th June 2019
NSW

Eligible vehicles carrying one or more shipping containers to or from a prescribed stevedore’s terminal can benefit from Concessional Mass Limits (CML) with an exemption to specific mass requirements under the National Heavy Vehicle Law (NHVL).

Road Infrastructure Management (RIM)

RIM Oversize Overmass Vehicle Movement Scheme (NSW)

Commencement Date: 1st June 2020
NSW

Transport for NSW (TfNSW) has introduced a new option for vehicles performing Oversize Overmass (OSOM) movements in NSW with extended duration permits.