TMA Livestock Loading Scheme

Telematics Monitoring Application (TMA)
A Requirement for B-triples and AB-triples operating under this Notice.
Provides access to the New South Wales Farm Gate Network.

This Notice provides mass exemptions that support the New South Wales Livestock Loading Scheme. This Notice works with the New South Wales Livestock Loading Scheme, and gives effect to the exemptions and conditions of that Scheme. This version of the Notice includes access to the New South Wales Farm Gate Network.

B-triples and AB-triples can now operate under this Notice if they are enrolled in the Telematics Monitoring Application (TMA), removing the need for IAP enrollment.

Benefits:

  • A Requirement for B-triples and AB-triples operating under this Notice
  • Access the New South Wales Farm Gate Network

Gazette Notice

TfNSW Business Rules

TfNSW Website

NSWLLS Map

Farm Gate Access Network Map

Other schemes where a Telematics Condition is required

Telematics Monitoring Application (TMA)

TMA Special Purpose Vehicle Monitoring Scheme

Commencement Date: 1/09/2021
VIC

Telematics Monitoring Application (TMA) or alternatively (IAP) is a required access condition for Special Purpose Vehicles (SPVs)

Road Infrastructure Management (RIM)

B-Double Farm Gate Access Scheme

Commencement Date: 26th February 2021
NSW

Provides exemptions for eligible heavy vehicles to access council roads within approved areas without Permit

Road Infrastructure Management (RIM)

Road Train Farm Gate Access Scheme

Commencement Date: 26th February 2021
NSW

Provides exemptions for eligible heavy vehicles to access council roads within approved areas without Permit.

Telematics Monitoring Application (TMA)

TMA PBS Level 2A Vehicle Monitoring Scheme

2021
NSW

A road condition for PBS vehicles operating in NSW

Advised Application

Class 1 Load Carrying Combination (Hunter Region) Mass and Dimension Exemption Notice

Advised Commencement Date: 1st July 2021
NSW

Exempts class 1 heavy vehicle combinations consisting of a prime mover and approved trailers, including dollies if required, from certain mass and dimension requirements under the HVNL. In addition, this notice exempts certain specialist vehicles such as block trucks that are used to assist the operation of class 1 combinations.

Road Infrastructure Management (RIM)

RIM PBS Level 1A Vehicle Monitoring Scheme

2021
NSW

A road condition for PBS vehicles operating in NSW

Telematics Monitoring Application (TMA)

Hill Descent Monitoring Scheme Lesmurdie Hill

2021
WA

Required for PBS Level 2B Scheme operating under permit on part of the MRWA road network

Telematics Monitoring Application (TMA)

TMA PBS Level 1B Vehicle Monitoring Scheme

2021
NSW

A road condition for PBS vehicles operating in NSW

Road Infrastructure Management (RIM)

Class 1 Oversize Overmass Vehicle Movement Scheme

Commencement Date: 1st June 2020
NSW

Transport for NSW (TfNSW) has introduced a new option for vehicles performing Oversize Overmass (OSOM) movements in NSW with extended duration permits.