Port Botany Container Movement Efficiency Scheme

Road Infrastructure Management (RIM)
The New South Wales Class 3 Port Botany Container Transportation Mass Exemption Notice 2019 (the Notice) allows eligible heavy vehicles carrying over-mass freight containers to operate above General Mass Limits (GML). This concession only applies when transporting standard shipping containers from an approved Stevedore Terminal to an approved Container Freight Station (CFS) along an approved route, and in compliance with the conditions of the Notice and Guide.

Benefits:

  • CML Axle Mass Limits
  • No HNVAS Mass Management Accreditation

Eligible Vehicles:

  • Rigid Trucks, Prime mover and semitrailer combinations up to 19m
  • B-doubles up to 26m

Additional Information:

Gazette Notice

New South Wales Class 3 Port Botany Container Transportation Mass Exemption Notice Operator’s Guide

Other schemes where a Telematics Condition is required

Road Infrastructure Management (RIM)

Road Train Farm Gate Access Scheme

Commencement Date: 26th February 2021
NSW

Provides exemptions for eligible heavy vehicles to access council roads within approved areas without Permit.

Road Infrastructure Management (RIM)

B-Double Farm Gate Access Scheme

Commencement Date: 26th February 2021
NSW

Provides exemptions for eligible heavy vehicles to access council roads within approved areas without Permit.

Road Infrastructure Management (RIM)

Semi-Trailer Farm Gate Access Scheme

Commencement Date: 26th February 2021
NSW

Provides exemptions for eligible heavy vehicles to access council roads within approved areas without Permit.

Telematics Monitoring Application (TMA)

TMA High Productivity Freight Vehicle Monitoring Scheme

Commencement Date: 1st of May 2021
VIC

New telematics requirements for HPFV and mobile cranes in VIC

Telematics Monitoring Application (TMA)

Higher Mass Limits (HML) Scheme

Commencement Date: 2nd April 2020
NSW

A new Higher Mass Limits (HML) Notice came into effect on 2nd April 2020 that allows HML heavy vehicles operating in NSW to be enrolled in Telematics Monitoring Application (TMA) instead of the Intelligent Access Program (IAP).

Telematics Monitoring Application (TMA)

Hill Descent Monitoring (HDM) Scheme Mount Ousley

11th June 2021
NSW

Required for some A-Double combinations operating under permit

Telematics Monitoring Application (TMA)

Hill Descent Monitoring (HDM) Scheme Roelands Hill

Commencement Data: 2019
WA

Required for AB-triples with tri-axle groups operating at CML on Roelands Hill

Telematics Monitoring Application (TMA)

PBS Vehicle Monitoring Scheme

Commencement Date: 1st of July 2020
TAS

Required to obtain access under Notice or via Permit for PBS Level 2 vehicle combinations exceeding 26m in length.

Road Infrastructure Management (RIM)

Port Botany Container Movement Efficiency Scheme

Commencement Date: 11th June 2019
NSW

Eligible vehicles carrying one or more shipping containers to or from a prescribed stevedore’s terminal can benefit from Concessional Mass Limits (CML) with an exemption to specific mass requirements under the National Heavy Vehicle Law (NHVL).