Oversize Overmass Vehicle Movement Scheme

Road Infrastructure Management (RIM)
Transport for NSW (TfNSW) has introduced a new option for vehicles performing Oversize Overmass (OSOM) movements in NSW. Under the new arrangements, transport operators can benefit from extended duration permits by enrolling in the Road Infrastructure Management (RIM) application.

Benefits:

  • For Laden permits, a 12-month permit can be obtained (instead of 3 months)
  • For Unladen permits, a 3-year permit can be obtained (instead of 12 months)

Eligible Vehicles / Permits

Extended OSOM permits are available to transport operators who have been issued an OSOM permit through the National Heavy Vehicle Regulator (NHVR) portal since 1 April 2020.

Check your NHVR portal for eligibility.

Additional Information

FAQ Sheet

NHVR Website

TCA Website

Talk to a Specialist

Would you like to talk to someone now? Please fill in your details and one of our specialists will contact you shorty.  

Thank you! We will be in touch shortly!

Oops! Something went wrong while submitting the form

Other schemes where a Telematics Condition is required

Telematics Monitoring Application (TMA)

TMA PBS Level 1A Vehicle Monitoring Scheme

2021
NSW

A road condition for PBS vehicles operating in NSW.

Telematics Monitoring Application (TMA)

TMA PBS Level 1B Vehicle Monitoring Scheme

2021
NSW

A road condition for PBS vehicles operating in NSW

Telematics Monitoring Application (TMA)

TMA PBS Level 2A Vehicle Monitoring Scheme

2021
NSW

A road condition for PBS vehicles operating in NSW

Telematics Monitoring Application (TMA)

TMA PBS Level 2B Vehicle Monitoring Scheme

2021
NSW

A road condition for PBS vehicles operating in NSW

Telematics Monitoring Application (TMA)

TMA SPV Monitoring Scheme – 4-Axle SPVs Up to 48 Tonnes

VIC

Administered by DOT to monitor road utilisation of 4-axle SPVs up to 48 tonnes operating under the applicable permit on approved routes on the Victorian road network

Telematics Monitoring Application (TMA)

TMA SPV Monitoring Scheme – 5-Axle SPVs Up to 60 Tonnes

VIC

Administered by DOT to monitor road utilisation of 5-axle SPVs up to 60 tonnes operating under the applicable permit on approved routes on the Victorian road network.

Telematics Monitoring Application (TMA)

TMA SPV Monitoring Scheme – 6-Axle SPVs Up to 72 Tonnes

VIC

Administered by DOT to monitor road utilisation of 6-Axle SPVs up to 72 tonnes operating under the applicable permit on approved routes on the Victorian road network.

Telematics Monitoring Application (TMA)

TMA SPV Monitoring Scheme – 7-Axle SPVs Up to 84 Tonnes

VIC

Administered by DOT to monitor road utilisation of 7-Axle SPVs up to 84 tonnes operating under the applicable permit on approved routes on the Victorian road network.

Telematics Monitoring Application (TMA)

TMA SPV Monitoring Scheme – 8-Axle SPVs Up to 96 Tonnes

VIC

Administered by DOT to monitor road utilisation of 8-Axle SPVs up to 96 tonnes operating under the applicable permit on approved routes on the Victorian road network.