TMA PBS Level 1B Vehicle Monitoring Scheme

Telematics Monitoring Application (TMA)

It is a road access condition that all PBS Level 2 access class 'B' vehicles/combinations and greater be enrolled in a minimum of Road Infrastructure Management (RIM) when operating at General Mass Limits or Concessional Mass Limits (GML/CML) or Telematics Monitoring Application (TMA) when operating at Higher Mass Limits (HML). Additional information on RIM and TMA can be found on the TCA website.

All PBS vehicles operating at HML are required to be enrolled in either TMA with a certified service provider or in the IAP in NSW.

PBS vehicles/combinations at all performance levels (i.e. Level 1-4) that do not meet Tier 1 bridge formulae for the level of access being requested (i.e. Tier 2 and/or Tier 3) are required to be enrolled in either TMA or in the IAP in NSW.

Transport for NSW Website

Other schemes where a Telematics Condition is required

Road Infrastructure Management (RIM)

RIM PBS Level 2A Vehicle Monitoring Scheme

2021
NSW

A road condition for PBS vehicles operating in NSW

Road Infrastructure Management (RIM)

B-Double Farm Gate Access Scheme

Commencement Date: 26th February 2021
NSW

Provides exemptions for eligible heavy vehicles to access council roads within approved areas without Permit.

Telematics Monitoring Application (TMA)

TMA PBS Level 2B Vehicle Monitoring Scheme

2021
NSW

A road condition for PBS vehicles operating in NSW

Telematics Monitoring Application (TMA)

Higher Mass Limits (HML) Scheme

Commencement Date: 2nd April 2020
NSW

A new Higher Mass Limits (HML) Notice came into effect on 2nd April 2020 that allows HML heavy vehicles operating in NSW to be enrolled in Telematics Monitoring Application (TMA) instead of the Intelligent Access Program (IAP).

Road Infrastructure Management (RIM)

Safety, Productivity & Environment Construction Transport Scheme (SPECTS)

Commencement Date: 1st July 2016
NSW

SPECTS allows participating heavy vehicles greater network access and the ability to carry more construction materials, in return for meeting higher environmental, safety and compliance standards.

Telematics Monitoring Application (TMA)

TMA High Productivity Freight Vehicle Monitoring Scheme

Commencement Date: 1st of May 2021
VIC

New telematics requirements for HPFV and mobile cranes in VIC

Telematics Monitoring Application (TMA)

Hill Descent Monitoring Scheme Lesmurdie Hill

2021
WA

Required for PBS Level 2B Scheme operating under permit on part of the MRWA road network

Telematics Monitoring Application (TMA)

Hill Descent Monitoring Scheme Roelands Hill

Commencement Data: 2019
WA

Required for AB-triples with tri-axle groups operating at CML on Roelands Hill

Telematics Monitoring Application (TMA)

Hill Descent Monitoring Scheme Mount Ousley

11th June 2021
NSW

Required for some A-Double combinations operating under permit